Back to search

Monterey, CA; Naval Postgraduate School

Economic analysis supporting the increase of the unspecified minor military construction threshold

Abstract

dc:description.abstract

This report analyzes the economical, technological, and environmental challenges U.S. Navy engineers face in constructing quality, usable facilities while meeting the constraints of the Unspecified Minor Military Construction (UMMC) threshold. By examining the Department of the Navy's Minor and Military Construction programs, conducting a comparative analysis of DD Form 1391s from past projects to evaluate cost escalation factors and analyzing construction escalation indices, this report supports the recent increase of the UMMC threshold from $750K to $1M and provides recommendations for future threshold determination.

Degree

thesis:*
Name thesis:degree_name
Master of Business Administration
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Business Administration
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2016

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Kelsey, Clifford L.
Advisors dc:contributor.advisor
  • Candreva, Philip
  • Menichini, Amilcar

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release; distribution is unlimited.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/49505

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Kelsey, Clifford L.. Economic analysis supporting the increase of the unspecified minor military construction threshold. Masters thesis, Monterey, CA; Naval Postgraduate School, 2016. https://hdl.handle.net/10945/49505