Back to search
Monterey, California. Naval Postgraduate School
A model to estimate the operating & maintenance (O & M) costs of the Mine Resistant Ambush Protected (MRAP) vehicles
Abstract
dc:description.abstractM cost per vehicle for SOCOM was observed to be much higher than that of other services for most of the cost elements. There were, however, insufficient data to verify the factors that bring about the high cost. The importance of the observations lies in the following:
Degree
thesis:*- Name thesis:degree_name
- M.S.
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Operations Research
- Department dc:contributor.department
- Operations Research
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 2010
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Chia, Tommy.
- Advisor dc:contributor.advisor
-
- Nussbaum, Daniel A.
- Committee member dc:contributor.committeemember
-
- Kang, Keebom
Subjects
dc:subject × 3Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- OCLC
- 698376250