Monterey, California. Naval Postgraduate School
Cost analysis of maintenance programs for pre-positioned war reserve material stock (PWRMS)
Abstract
dc:description.abstractineering Command (Seabee Readiness and Logistics, SRL) and Code N44, CBC Port Hueneme CESE Management Branch, need to determine the amount of funding required in order to adequately maintain CESE PWRMS in a Ready-For-Issue (RFI) condition. PWRMS is considered mission essential, but the Project Managers' ability to rapidly respond to a contingency and meet the scheduled mobilization dates are predicated on the ability to get the PWRMS out of storage, mobilized, and transported to the contingency. Therefore, this thesis has direct operational readiness implications. The OMN funding required to maintain CESE PWRMS in a RFI condition was estimated using assumptions for cost of materials, estimates for labor expenditures, and frequency of use of equipment. Recommendations include modifications to the current program's objectives and improvements to issues noted in this study. Areas of further study are provided for improved budgetary decisions.
Degree
thesis:*- Name thesis:degree_name
- M.S. in Management
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 2002
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Cyr, Phillip G.
- Advisors dc:contributor.advisor
-
- Liao, Shu S.
- Mutty, John E.
Subjects
dc:subject × 2Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.