Back to search

Monterey, CA; Naval Postgraduate School

The capability of the air mobility fleet to adequately support army transformation requirements

Abstract

dc:description.abstract

The current plan to procure only 134 C-17 Globemaster III aircraft to replace the C-141 fleet will not meet U.S. wartime requirements for core strategic airlift. Although the C-17 is now exceeding design expectations, the fleet will not provide enough core airlift volume for the United States in the 21st Century. The Army will support Phase I of the Army transformation as it stands up two Initial Brigade Combat teams. These brigades will have the capability of being deployed anywhere in the world in 96 hours from first aircraft wheels up. Units are being formed with off-the-shelf capabilities and lessons learned from operational experience and the Army's Experimentation Campaign Plan. This thesis examines the ability of our current and future airlift fleet to project and sustain U.S. power abroad as changes are identified in the Army's Transformation process.

Degree

thesis:*
Name thesis:degree_name
M.S. in Management
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Management
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2002

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Peden, Kim D.
Advisors dc:contributor.advisor
  • Lewis, Ira A.
  • Gates, William R.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/6036

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Peden, Kim D.. The capability of the air mobility fleet to adequately support army transformation requirements. Masters thesis, Monterey, CA; Naval Postgraduate School, 2002. https://hdl.handle.net/10945/6036