Monterey, California. Naval Postgraduate School
A cost estimation model for Commander Naval Air Forces Pacific's TACAIR F/A-18S Aviation Depot Level repair costs
Abstract
dc:description.abstractThe goal of this thesis is to develop a model that Commander Naval Air Forces Pacific (CNAP) can use to estimate future TACAIR F/A-18 Aviation Depot Level Repair (AVDLR) costs. The thesis is divided into three sections. The first section discusses the methodology used to create a cost estimation model. The second and third sections provide the results of the modelαs outcomes and compares and analyzes those results to the actual results. The modelαs estimate was 19% below Fiscal Year 2001αs actual costs. This shortfall was caused by a 27% increase in Navy C modelαs AVDLR costs, which is more than twice their average annual cost increase. Since Navy C models represent over 60% of CNAPαs total TACAIR F/A-18 AVDLR costs, this unexpected increase in costs is the major contributor to the modelαs 19% difference from its estimate. In order to correct this difference in the future it is recommended that the model shift from estimating yearly costs to estimating quarterly costs to become a more accurate cost-estimating model.
Degree
thesis:*- Name thesis:degree_name
- M.S.
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Management
- Department dc:contributor.department
- Management
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 2001
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Duma, David Paul.
- Advisor dc:contributor.advisor
-
- Jones, Lawrence R.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- OCLC
- 267031