California State University Northridge
Implementation of Strategic Lean-to the Naval Construction Forces in order to improve the Supply Chain in Class IV material
Abstract
dc:description.abstractThis project focuses on logistics and supply chain management operations in support of the procurement of construction material in the Naval Construction Forces to approach opportunities to improve efficiency and competitiveness. Using Lean Concept, we analyze the process and identify different types of waist in order to optimize the support outcome. As a result the report brings seven recommendations to be implemented such as (1) centralize the design, (2) add the Planning and Estimate into the Readiness Program (3) Extend the Supply Chain Network (4) Create a program owner (5) Reduce time between NMCB Turnover in the Pacific (6) Create an inventory system and allocate one common data-base and (7) Mapping FMEA and Operation Risk. These recommendations have the potential to bring the project cycle from 16 to 25 months down to 10 to 14 months. As well this creates a more suitable enterprise for sustainability and more an independent process.
Degree
thesis:*- Level thesis:degree_level
- Masters
- Grantor dc:publisher
- California State University Northridge
- Year dc:date.issued
- 2019
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Espinosa, Andres
- Advisor dc:contributor.advisor
-
- Gandhi, Shereazad Jimmy
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/63164