Monterey, CA; Naval Postgraduate School
ANALYSIS OF THE INCREASING TREND IN EXPENDED MAN-DAYS FOR SELECTED 688-CLASS SUBMARINE DSRAS AT PEARL HARBOR NAVAL SHIPYARD
Abstract
dc:description.abstractThe purpose of this research is to establish and analyze trends for direct labor man-days charged to selected 688-class submarines at Pearl Harbor Naval Shipyard (PHNSY). Based on recommendations from previous studies, this research is focused on analyzing the 100 Series of maintenance for nine selected submarines undergoing Docking Selected Restricted Availabilities (DSRAs) between 2010 and 2015. The 100 Series includes the hull and tanks, which frequently experience work growth over the availability. Additionally, further analysis was conducted on a possible hull-age correction factor used to explain increased labor trends, and a simple Monte Carlo simulation was used in an attempt to estimate final labor cost of the DSRAs. Our research is aimed at identifying existing trends and attempting to explain why those trends may exist.
Degree
thesis:*- Name thesis:degree_name
- Master of Business Administration
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Master of Business Administration
- Grantor dc:publisher
- Monterey, CA; Naval Postgraduate School
- Year dc:date.issued
- 2019
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Lindle, Mark
- Wisz, Ryan
- Advisors dc:contributor.advisor
-
- Landry, Steven P.
- Eger, Robert J., III
Rights
dc:rights- Statement dc:rights
-
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Thesis Thesis Identifier
- 34415