Monterey, CA; Naval Postgraduate School
CH-53K HEAVY-LIFT HELICOPTER PROGRAM ACQUISITION CASE HISTORY
Abstract
dc:description.abstractThe purpose of this research is to analyze the acquisition process of the U.S. Marine Corps (USMC) CH-53K King Stallion heavy-lift helicopter. With the ability to carry 27,000 lbs over 110 nautical miles in hot temperatures and within the same shipboard logistic footprint as its predecessor, the CH-53K will be the backbone of the USMC’s ship-to-shore aviation operations. However, numerous performance setbacks have incurred significant cost growth for the USMC and delayed the aircraft’s deployment to 2023–2024, two decades after the program was initiated in 2003. This research examines the program, in the format of a case history, to better understand the decisions and scenarios that led to increased cost growth and delayed schedules. The case history is intended to educate readers on the numerous complex considerations found within any acquisition process, in the hopes of applying the lessons learned to future programs in order to provide the best solution for the warfighter.
Degree
thesis:*- Name thesis:degree_name
- Master of Business Administration
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Master of Business Administration
- Grantor dc:publisher
- Monterey, CA; Naval Postgraduate School
- Year dc:date.issued
- 2020
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Delgado, Alexis
- Advisor dc:contributor.advisor
-
- Mortlock, Robert F.
- Committee member dc:contributor.committeemember
-
- Friedman, Mitchell S.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release. distribution is unlimited
Identifiers
dc:identifier.*- Dc Identifier Programcode
- 837, Financial Management
- Thesis Thesis Identifier
- 34916