Back to search

Monterey, CA; Naval Postgraduate School

DETERMINING THE COST AND REDUCTION OF RISK TO FORCE THRESHOLD FOR TRANSITIONING SMALL FORWARD OPERATING BASE POWER GENERATION TO ADVANCED SYSTEMS

Abstract

dc:description.abstract

Two decades of multi-front conflict in the Middle East have given logisticians and policymakers ample time to evaluate the efficacy of how to resupply and internally sustain forward operating bases (FOB). Specifically, studies have shown that there are manageable connections between the fuel consumed by an FOB, the costs to sustain that FOB with fuel for powering generators, and the potential to reduce the casualties associated with logistics resupply. Considerable research shows that the United States Department of Defense needs to consider alternative methods of power production on FOBs in order to reduce the total ownership costs of operating the FOB and the cost of human life to sustain the FOB that is attributable to logistics resupply missions. This project explores the current costs of sustaining an expeditionary FOB and how the implementation of existing technology could help mitigate those costs. It seeks to establish a potential risk to life savings that could be accomplished by reducing the periodicity of resupply. It is recommended that proof of concept be established for the concept of solar in a box through commercially available systems, such as the system explored in the project.

Degree

thesis:*
Name thesis:degree_name
Master of Business Administration
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Master of Business Administration
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2020

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Morlan, Jason R.
Advisors dc:contributor.advisor
  • Nussbaum, Daniel A.
  • Ferrer, Geraldo
  • Howard, Alan R.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
  • Approved for public release. distribution is unlimited

Identifiers

dc:identifier.*
Dc Identifier Programcode
819, Supply Chain Management
Thesis Thesis Identifier
35033

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Morlan, Jason R.. DETERMINING THE COST AND REDUCTION OF RISK TO FORCE THRESHOLD FOR TRANSITIONING SMALL FORWARD OPERATING BASE POWER GENERATION TO ADVANCED SYSTEMS. Masters thesis, Monterey, CA; Naval Postgraduate School, 2020. https://hdl.handle.net/10945/66692