Monterey, CA; Naval Postgraduate School
OPTIMIZING LITTORAL CONNECTOR EMPLOYMENT USING FULLY CONNECTED AND REDUCED NETWORKS
Abstract
dc:description.abstractThe Marine Corps’ shift toward Expeditionary Advanced Base Operations (EABO), as initially laid out in General Berger's Commandant's Planning Guidance and Force Design 2030, focuses on deploying small, distributed forces across island chains. Existing Navy connectors are inadequate for supporting EABO, prompting the development of the medium landing ship (LSM) to address this gap, though how it will be employed remains undeveloped. Proper routing of littoral connectors is essential to prevent delays in delivering mission-critical components, which could negatively affect operational timelines. Current routing methods either produce solutions of unknown quality or require unrealistic computing times. The latest model reduces these times using a linear programming relaxation, but it still delivers suboptimal results due to network limitations. This research addresses these limitations by proposing network simplification through node and arc reduction and the introduction of virtual arcs to create a fully connected, reduced network designed for more efficient routing. Our experiments confirm that these network simplifications improve runtime and/or delivery time. Notably, the fully connected reduced network approach achieved the fastest final serial delivery time of 8.5 days, providing a highly balanced and responsive solution for planners. This work enhances the optimization of littoral connector employment, addressing a critical capability gap in EABO logistics.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Operations Research
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Operations Research
- Department dc:contributor.department
- Operations Research (OR)
- Grantor dc:publisher
- Monterey, CA; Naval Postgraduate School
- Year dc:date.issued
- 2025
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Burke, Mary G.
- Advisors dc:contributor.advisor
-
- Carlyle, W. Matthew
- Craparo, Emily M.
- Committee member dc:contributor.committeemember
-
- Gordon, Joshua
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Distribution Statement A. Approved for public release: Distribution is unlimited.
Identifiers
dc:identifier.*- Dc Identifier Other
- NPS-24-M112-A
- Dc Identifier Programcode
- 360, Operations Analysis
- Thesis Thesis Identifier
- 40642