Change Management best practice use in NAVFAC and other public projects
Abstract
dc:description.abstractThe Construction Industry Institute (CII) has identified 11 best practices that have shown significant value in improving performance on construction projects. One of these practices is Project Change Management (PCM) . Extensive research by CII has shown that use of this practice can reduce cost growth and schedule growth. The purpose of this thesis is to evaluate the use of PCM on construction projects by the Naval Facilities Engineering Command (NAVFAC). It will then compare and contrast NAVFAC's use of PCM to CII's change management practice use as a whole. Comparisons to change management practice use by other public agencies within CII will be made as well. There are 14 elements to the project change management practice. This thesis shows which PCM practice elements are being used by NAVFAC, and compares their use to practice use by other public CII companies and other private CII companies. An analysis of NAVFAC projects is completed to show if PCM practice elements have the same impact on cost and schedule for NAVFAC as they do for other CII companies. Conclusions and recommendations are presented based on the results of the analysis.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Engineering
- Grantor dc:publisher
- University of Texas at Austin
- Year dc:date.issued
- 2000
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Sanders, Scot Thomas
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- OCLC
- ocn640952680