Back to search

University of Texas at Austin

Best practice influence on project changes during the construction phase.

Abstract

dc:description.abstract

This thesis analyzes the influence of team building, constructability, and project change management best practices on the reduction of project changes during the construction phase. Construction Industry Institute Owner, Naval Facilities Command, and Construction Industry Institute Contractor data are separately evaluated to determine if a statistically significance relationship between best practice use and a reduction in the project change rate during construction exists. Conclusions and recommendations for the reduction of the project change rate during construction are offered

Degree

thesis:*
Name thesis:degree_name
Master of Science in Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Engineering
Grantor dc:publisher
University of Texas at Austin
Year dc:date.issued
1998

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ciaravino, Brian Douglas

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Identifiers

dc:identifier.*
OCLC
ocm640923807

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Ciaravino, Brian Douglas. Best practice influence on project changes during the construction phase.. Masters thesis, University of Texas at Austin, 1998. https://hdl.handle.net/10945/8029