Abstract
dc:description.abstractAligning both owner and contractor objectives is widely thought to be a catalyst for better project performance. For this very reason, contract incentives are employed in order to identify and ensure focus on the owner's goals. The scope of this report is to research the extent of use and consequent effects of construction contract incentives offered by owners. The relative use by owners of construction phase incentives will be characterized, and an incentive use index assigned to each project. Additionally, the impacts of incentive use in terms of cost, schedule, and safety will be investigated. A relationship between the relative incentive use (incentive index) and project performance will also be examined
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Engineering
- Grantor dc:publisher
- University of Texas
- Year dc:date.issued
- 1998
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Mitchell, Jayson Doliber
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- OCLC
- ocm640923805