Abstract
dc:description.abstractOptimally scheduling a team of developers on a large software project is an NP- complete problem. The scheduling algorithm employed by the Evolutionary Control System (ECS) portion of the Computer-Aided Prototyping System (CAPS) does near-optimal scheduling using an algorithm that runs in Order N2 space and time. The problem addressed by this thesis is to improve the performance of the algorithm and make it more useful for scheduling software developers. The thesis accomplished three things: (1) Modified the algorithm to run in order N time and space, preserving its near-optimal behavior; (2) implemented a calendaring package that computes federal holidays for any year after 1970 and schedules tasks only on non-holiday workdays; and (3) incorporated a more realistic capability model to better match programming tasks with each developer's abilities
Degree
thesis:*- Name thesis:degree_name
- M.S. in Software Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Software Engineering
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1997
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Evans, John
- Advisors dc:contributor.advisor
-
- Berzins, Valdis
- Luqi
Rights
dc:rights- Statement dc:rights
-
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/8863