Abstract
dc:description.abstractThe objectives of this report are as follows: (1) Develop SIPOC (supplier-Input-Process-Output-Customer) diagrams for PWD Keflavik (2) Capture the existing measures and reporting techniques at PWD Keflavik. (3) Analyze the measures for viability. (4) Develop a list of viable metrics (Remove the measures that are unnecessary and add any that are necessary for PWD Keflavik.) (5) Develop a training plan for the PWD Keflavik workers in the data gathering and reporting of the metrics.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Engineering
- Grantor dc:publisher
- University of Texas at Austin
- Year dc:date.issued
- 1997
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Witta, Charles
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/8874