Back to search

University of Hawaii

Timber vs. composite/plastic pile fender systems in Pearl Harbor maintenance cost comparison

Abstract

dc:description.abstract

The Navy has traditionally used treated timber materials for fender systems for piers and wharves in Pearl Harbor. In recent years, the costs associated with the use of timber have escalated and the Navy has begun to use plastic piles at installations around the world to replace timber fender systems. Plastic fender systems are more expensive, but have greater energy absorption capabilities and are more resilient to environmental decay. To determine whether plastic piles are a cost saving alternative to treated timber, the present study compiled and evaluated existing technical data, maintenance/ construction records and inspection reports from various Navy staff civil engineer offices and at the Navy Public Works Center Pearl Harbor (PWC). Since records at these various locations were not designed to present associated cost/ maintenance data in a format suitable for an economic analysis, field surveys of over 3 miles of waterfront in Pearl Harbor and interviews with staff civil engineers and wharf building branch managers at PWC were conducted to supplement existing historical data. Through the gathered data, the maintenance costs of timber pile fenders are estimated and compared to those of composite plastic piles using manufacturers' quotes and from reports compiled by the Navy Civil Engineering Laboratory (NCEL). For the expected life cycles of timber piles observed in Pearl Harbor this analysis shows the proposed plastic system to be more cost effective for shore facilities with remaining service lives of greater than ten years.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Ocean Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Ocean Engineering
Grantor dc:publisher
University of Hawaii
Year dc:date.issued
1996

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Alling, Joseph

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/9075

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Alling, Joseph. Timber vs. composite/plastic pile fender systems in Pearl Harbor maintenance cost comparison. Masters thesis, University of Hawaii, 1996. https://hdl.handle.net/10945/9075