Monterey, CA; Naval Postgraduate School
Analysis of an affordability index model for Marine Corps ground combat equipment
Abstract
dc:description.abstractThe purpose of this MBA Project is to conduct an analysis of Marine Corps Logistics Command (LOGCOM) proposed Affordability Index (AI) model. This project was conducted with the sponsorship and assistance of LOGCOM. The goal of this project is to analyze the validity and usability of the AI model, and to recommend an alternative solution. The impetus behind the AI model is to view cost-to-readiness and determine the return on investment (ROI) of allocating scarce maintenance funds on system sustainability. The recommended alternative to the AI is a readiness-to-cost model. This alternative model produces a graphical depiction of readiness-to-cost over time. This model allows maintenance managers, commanders, and logistics analysts to conduct trend analysis on maintenance spending and readiness in order to plan and allocate maintenance funds and resources.
Degree
thesis:*- Name thesis:degree_name
- Master of Business Administration
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Business Administration
- Grantor dc:publisher
- Monterey, CA; Naval Postgraduate School
- Year dc:date.issued
- 2004
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Wilkerson, John D.
- Simmons, Melissa C.
- Katz, Joseph A.
- Advisors dc:contributor.advisor
-
- McNab, Robert M.
- Wall, Kent D.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Approved for public release; distribution is unlimited.
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/9918