Back to search

Old Dominion University

Unplanned Maintenance Scheduling a Lean Application Using Group Technology and Adaptive Conflict Resolution

Abstract

dc:description.abstract

Historically, production of ships is based on Group Technology (GT) with product oriented work breakdown structure. Recent GT applications have been effectively adapted to ship maintenance operations. In this thesis we have developed a GT based classification and coding system for the three basic requirements for maintenance operations: personnel, resources and space. Traditionally unplanned maintenance activities are executed as and when the resources are available. This thesis presents a method for planning and scheduling these jobs with many of the traditional Lean manufacturing principles first adapted appropriately and then applied to Lean Maintenance. This method begins with identifying the priority levels of all maintenance requests. Then personnel, resource and spatial requirements of the jobs are identified using the GT based classification and coding system. Personnel and resources are assigned to jobs by applying concepts of Lean. Finally, these jobs are scheduled according to their priority level. A C++ computer program has been developed for scheduling jobs. Two case studies represent detailed examples of planning and scheduling using the above described method. This thesis is an attempt to bring in Lean principles, GT and a workable strategy for conflict resolution to solve realistic unplanned maintenance problems.

Degree

thesis:*
Name thesis:degree_name
Master of Science (MS)
Level thesis:degree_level
Thesis
Discipline thesis:degree_discipline
Mechanical & Aerospace Engineering

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Mittal, Manish Shashibhushan
Contributors dc:contributor
  • Han P. Bao
  • Shannon Bowling
  • Miltiadis Kotinis

Subjects

dc:subject × 5

Rights

dc:rights
Statement dc:rights
  • <p>In Copyright. URI: <a href="http://rightsstatements.org/vocab/InC/1.0/">http://rightsstatements.org/vocab/InC/1.0/</a> This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).</p>

Identifiers

dc:identifier.*
Repository record dc:identifier
https://digitalcommons.odu.edu/mae_etds/623

Chain of custody

source
Harvested from
Old Dominion University
Base URL
digitalcommons.odu.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Mittal, Manish Shashibhushan. Unplanned Maintenance Scheduling a Lean Application Using Group Technology and Adaptive Conflict Resolution. Thesis thesis, https://digitalcommons.odu.edu/mae_etds/623