Back to search

Old Dominion University

The Effects of a Modified Gantt Chart Depicting Schedule Risk

Abstract

dc:description.abstract

The tools and methodologies used to manage projects continue to evolve. A popular project management tool for monitoring a project's schedule is the Gantt chart. The Gantt chart provides information about projected start and end times for each task of a project. A critical limitation of the Gantt chart, however, is its inability to depict uncertainty surrounding the project schedule, or project schedule risk. The present study investigated the effectiveness of three alternative formats for depicting schedule risk. The three presentation formats used were a table, a table with a traditional Gantt chart, and a table and a modified Gantt chart that includes a triangular distribution to represent schedule risk. Eighteen undergraduate students viewed three PowerPoint slideshow presentations containing thirty questions each. The independent variables of task type (single or multiple) and question type (specific date, contingency, or distribution) resulted in six question categories. The measures of effectiveness for each presentation format were accuracy and speed. Results showed the modified Gantt was more effective for conveying schedule risk on distribution and contingency questions than the other two formats. These findings could have important design implications in the how future project management applications convey schedule risk.

Degree

thesis:*
Name thesis:degree_name
Master of Science (MS)
Level thesis:degree_level
Thesis
Discipline thesis:degree_discipline
Computational Modeling & Simulation Engineering

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hope, Joseph Allen
Contributors dc:contributor
  • Mark W. Scerbo
  • David A. Dryer
  • Carryl L. Baldwin

Subjects

dc:subject × 5

Rights

dc:rights
Statement dc:rights
  • <p>In Copyright. URI: <a href="http://rightsstatements.org/vocab/InC/1.0/">http://rightsstatements.org/vocab/InC/1.0/</a> This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).</p>

Identifiers

dc:identifier.*
Repository record dc:identifier
https://digitalcommons.odu.edu/msve_etds/87

Chain of custody

source
Harvested from
Old Dominion University
Base URL
digitalcommons.odu.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Hope, Joseph Allen. The Effects of a Modified Gantt Chart Depicting Schedule Risk. Thesis thesis, https://digitalcommons.odu.edu/msve_etds/87