Evaluating the Cost of Sewer Disposal to Other Alternatives for the Management of Truck Wash Water Generated During Winter Maintenance Activities
Abstract
dc:descriptionThe trucks performing snow and ice removal for the Ohio Department of Transportation are frequently washed to prevent corrosion associated with the salt the trucks spread on the roadways. Strategies for the management of wash water generated during routine washing of salt trucks have been previously studied and collecting and hauling off-site for disposal or connecting to a sanitary sewer system have generally been determined to be the most feasible options. The purpose of this research is to compare the annualized cost of both strategies to determine the most cost effective option by using a probabilistic based approach. The cost equation input variables were based on two datasets; statewide data for all ODOT maintenance facilities and data for ODOT maintenance facilities without access to the sanitary sewer, as well as labor rate, cost of fuel, and discount rate. The variables were defined by probability distribution and cost calculations were performed using Monte Carlo Simulation. The calculations determined that the annualized cost of the management strategies were most sensitive to the number of trucks, number of winter events, roundtrip hauling distance, capital cost of the sanitary sewer and discount rate. The change in the probability that the collection and off-site hauling of wash water for disposal is the most cost effective strategy was less than 30% when the capital cost of the sanitary sewer connection was $300,000 or greater. The probabilities were much more sensitive to the changes in the key input variables when the sanitary sewer capital cost was set to $100,000.The overall probability based on all input distributions was calculated based on the capital cost of the sanitary sewer. For all facilities, the collection and off-site disposal strategy has a 90% or greater probability to be the most cost effective strategy when the capital cost exceeds $280,000; however, the capital cost decreases to $172,000 for the same probabilities when considering only facilities without existing sanitary sewer access. This result revealed that collection and off-site disposal is the generally the most cost effective management strategy for ODOT maintenance facilities currently lacking sanitary sewer access when the capital cost of connecting to the sanitary sewer exceeds $100,000.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Engineering
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Civil Engineering
- Grantor dc:publisher
- University of Akron
- Year dc:date
- 2014
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Slaga, Joshua J.
- Advisor dc:contributor.advisor
-
- Miller, Christopher
Subjects
dc:subject × 5Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=akron1396817103