Back to search

Bowling Green State University

Comparison of Union and Non-Union Bids on Ohio School Facilities Commission Construction Projects

Abstract

dc:description

The following study analyzes the bid amounts per square foot of union and non-union contractors submitted for public school projects performed under the oversight of the Ohio School Facilities Commission. By comparing statistical results it will be possible to determine if union contractor bid amounts are competitive with those of non-union contractors.Bid amounts were grouped by regions of Ohio, CSI Divisions and the state of Ohio as a whole then tested for significant difference using an ANOVA analysis. This research hypothesizes that non-union contractor bid amounts per square foot are significantly less than union contractor bid amounts per square foot in the Ohio school projects. The overall conclusion of the research was the rejection of the hypothesis indicating that there was no significant difference between the bid amount per square foot of union and non-union contractors.

Degree

thesis:*
Name thesis:degree_name
Master of Technology Management (MTM)
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Technology/Construction Management and Technology
Grantor dc:publisher
Bowling Green State University
Year dc:date
2009

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Welsh, Matthew J.
Chair dc:contributor.committeechair
  • Atalah, Dr. Alan

Subjects

dc:subject × 11

Rights

dc:rights
Statement dc:rights
  • unrestricted
  • This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
Language dc:language
English

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
OhioLINK
Base URL
etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Welsh, Matthew J.. Comparison of Union and Non-Union Bids on Ohio School Facilities Commission Construction Projects. masters thesis, Bowling Green State University, 2009. http://rave.ohiolink.edu/etdc/view?acc_num=bgsu1231207723