Abstract
dc:description<p>Following are the processes and results of the development of a more accurate forging cost estimating equation useful for any forged part of given material and final dimensions. A current forging cost estimating equation standard is used as a benchmark. Error from this equation is calculated at 23 percent. Prototype equations are developed using current methods of metal processing. Models are then tweaked or discarded as testing progresses through varied methods of error trapping. The final equation (below) has an error of 15 percent, a reduction of eight percent over the benchmark.</p><p>Process cost = K*E*F<sub>com</sub>*(A*P<sub>ave</sub>)<sup>n</sup></p><p>Where K and n are constants, A is the cross-sectional area of the forging, Pave is the average pressure needed to produce the forging using the “slab” method of calculation, E is an escalation factor ($102.57 in this study), and F<sub>com</sub> is a forging shape complexity multiplier.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science (MS)
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Mechanical Engineering (Engineering)
- Grantor dc:publisher
- Ohio University
- Year dc:date
- 2005
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Rankin, John C.
- Advisor dc:contributor.advisor
-
- Mehta, Bhavin
Subjects
dc:subject × 7Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1129661983