Back to search

Ohio University

SCHEDULING ROTARY INJECTION MOLDING MACHINE

Abstract

dc:description

This thesis focuses on scheduling a rotary injection molding machine at a shoe manufacturing plant. A group of three scheduling heuristics were developed by applying a basic machine scheduling methodology. The three heuristics are: HP-2 (Left/Right Rule), HP-3 (Min ÄCt Rule) and HP-4 (Left/Right with Min ÄCt Rule). The objective of these heuristic procedures is to minimize the makespan in the rotary machine scheduling. The heuristics are encoded using Matlab, which is a software application used in engineering and scientific applications. The software application is used to test and compare the performance of the above heuristics with respect to makespan. After performing extensive experimentation using varied sets of data, it is observed that, HP-3 (Min ÄCt Rule) consistently performed better than the rest and is thus suggested as the heuristic of choice.

Degree

thesis:*
Name thesis:degree_name
Master of Science (MS)
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Industrial and Manufacturing Systems Engineering (Engineering)
Grantor dc:publisher
Ohio University
Year dc:date
2005

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Urs, Shravan B. R.
Advisor dc:contributor.advisor
  • Süer, Gürsel

Subjects

dc:subject × 5

Rights

dc:rights
Statement dc:rights
  • unrestricted
  • This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
Language dc:language
English

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
OhioLINK
Base URL
etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Urs, Shravan B. R.. SCHEDULING ROTARY INJECTION MOLDING MACHINE. masters thesis, Ohio University, 2005. http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1132529304