Ohio University
Development of a PC-based cost engineering algorithm for capital intensive industries based on the methodology of total absorption standard costing
Abstract
dc:description<p>Several product costing methodologies have been developed throughout the years. However, most of these techniques are distribution based, where the products cost fluctuates with the production volume and the utilization of facilities. In this study, a new approach was developed which allows the costing of products at each level of materials flow based on the time-use of the facilities, and independently of the volume produced. By developing use-rates for the cost producing elements, coupled with a computer-based information system, all costs are accumulated and fully absorbed at each stage, beginning with the creation of the product until its distribution to the customer. Standard and actual costs can be compared for different production runs, by batch, by operation, by machine, by department, and by facility. Therefore, management is able to pin point production variances, cost variances, utilization and efficiency measures, and product cost control.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science (MS)
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Industrial and Manufacturing Systems Engineering (Engineering)
- Grantor dc:publisher
- Ohio University
- Year dc:date
- 1992
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Alsawaf, Anas
- Advisor dc:contributor.advisor
-
- Sims, Jr, E.
Subjects
dc:subject × 5Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1176492634