Abstract
dc:descriptionThis research focuses on an often overlooked part of a facilities re-layout project: developing the project schedule. By moving departments to temporary locations, it is possible to reduce the overall project duration while increasing costs. A mixed integer programming model finds schedules that minimize department move costs to meet a given duration subject to precedence constraints. An algorithm uses this model to find non-dominated time and cost solutions to the re- layout problem. The algorithm is demonstrated on three actual re-layout projects.
Degree
thesis:*- Name thesis:degree_name
- Master of Science (MS)
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Industrial and Manufacturing Systems Engineering (Engineering)
- Grantor dc:publisher
- Ohio University
- Year dc:date
- 1994
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Vijayvargiya, Mool C.
- Advisor dc:contributor.advisor
-
- Lacksonen, Thomas
Subjects
dc:subject × 4Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1178737658