Abstract
dc:description<p>Quality and production scheduling are becoming an increasingly important consideration in mine planning. Current manual methods of production planning and scheduling are unable to perform the complex calculations needed for an acceptable production schedule which satisfies a specific quality requirement.</p> <p>This study attempts to incorporate mathematical programming as well as an heuristic approach to mine production scheduling. Rather than starting from a given mine layout, the proposed system employs the linear programming and a scheduling routine to determine the sequence in which blocks of ore are to be mined in order to meet production and quality requirements for a given planning horizon. The areas must also satisfy precedence restrictions which are imposed by the mine method.</p> <p>An interactive computer programming package which provides possible alternatives schedules has been tested on an underground coal deposit. The model provided meaningful results, that is, generated a mining sequence that met specified quality and production requirements.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science (MS)
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Industrial and Manufacturing Systems Engineering (Engineering)
- Grantor dc:publisher
- Ohio University
- Year dc:date
- 1991
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Herjanto, Eddy
- Advisor dc:contributor.advisor
-
- Scheck, Donald
Subjects
dc:subject × 3Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1183729474