Back to results

Ohio University

Multi stage approach to mine scheduling

Abstract

dc:description

<p>Quality and production scheduling are becoming an increasingly important consideration in mine planning. Current manual methods of production planning and scheduling are unable to perform the complex calculations needed for an acceptable production schedule which satisfies a specific quality requirement.</p> <p>This study attempts to incorporate mathematical programming as well as an heuristic approach to mine production scheduling. Rather than starting from a given mine layout, the proposed system employs the linear programming and a scheduling routine to determine the sequence in which blocks of ore are to be mined in order to meet production and quality requirements for a given planning horizon. The areas must also satisfy precedence restrictions which are imposed by the mine method.</p> <p>An interactive computer programming package which provides possible alternatives schedules has been tested on an underground coal deposit. The model provided meaningful results, that is, generated a mining sequence that met specified quality and production requirements.</p>

Degree

thesis:*
Name thesis:degree_name
Master of Science (MS)
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Industrial and Manufacturing Systems Engineering (Engineering)
Grantor dc:publisher
Ohio University
Year dc:date
1991

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Herjanto, Eddy
Advisor dc:contributor.advisor
  • Scheck, Donald

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • unrestricted
  • This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
Language dc:language
English

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
OhioLINK
Base URL
etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Herjanto, Eddy. Multi stage approach to mine scheduling. masters thesis, Ohio University, 1991. http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1183729474