Ohio University
Cell Loading and Family Scheduling for Jobs with Individual Due Dates in a Shoe Manufacturing Company
Abstract
dc:descriptionIn this study, the problem studied is cell loading and family scheduling in a cellular manufacturing environment. What separates this study from others is the presence of individual due dates for every job in a family. Family splitting among cells is allowed even though this will cause number of setups to increase as long as values improve the number of tardy jobs, the total tardiness, and the maximum tardiness. Two methods are employed in order to solve this problem, namely Mathematical Modeling and Genetic Algorithms. Finally, it is concluded that the Genetic Algorithm approach is efficient compared to the Mathematical Modeling especially for larger problems in terms of execution times.
Degree
thesis:*- Name thesis:degree_name
- Master of Science (MS)
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Industrial and Systems Engineering (Engineering and Technology)
- Grantor dc:publisher
- Ohio University
- Year dc:date
- 2009
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Mese, Emre M.
- Advisor dc:contributor.advisor
-
- Suer, Gursel A.
Subjects
dc:subject × 6Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1248975462