Development of Neural Network Models for Prediction of Highway Construction Cost and Project Duration
Abstract
dc:description<p>Early understanding of construction cost and time represents a critical factor of a feasibility study in the early design phase of a project. All parties involved in the construction of a project; owners, contractors, and services companies are in need of reliable information about the cost and time in the early stages of the project. Therefore, this research work attempts to develop a consistent model of forecasting early design construction cost of highway and the project’s duration. A wide review of the literature of the cost and project duration determined the significance of reliable methods to predict construction cost and project’s duration. At this time, researchers suffer lack of information in the early phases of project to identify and analyze parameters and their relationship related to duration of projects. However, there have been numerous attempts to develop improved models for construction cost prediction of highway based on different techniques. </p><p>This research aims to develop construction cost and duration prediction models of highway based on statistical analysis. Consequently, the statistical techniques used in this research work represent Artificial Neural Networks (ANN) and step wise regression analysis to identify the influential parameters and forecast the early design phase of highway construction cost and duration. The input data used to develop the mathematical models were compiled and maintained by the Virginia Department of Transportation .The data used in these modeling were extracted from two sources within VDOT: Data Warehouse Management Information Portal (DWMIP) and Project Cost Estimating System (PCES)”. The parametric stage data were maintained in Project Cost Estimating System (PCES) by VDOT. In addition, for the identification of effective parameters used in these models, two separate techniques were used; sorting and identifying the effective parameters used in traditional techniques, the trial and elimination method of ANNs, and sensitivity analysis. Consequently, the chosen parameters were analyzed by two distinct statistical techniques: linear regression analysis and non linear ANN. Also, the given data were classified and analyzed for full depth section and improvement of highway and each section was classified as a full or condensed model. The same classification and analytical procedure was used for both the highway’s cost prediction and the projects’ duration prediction.</p><p>As the result of effective parameters identification and prediction models analysis the ANN outcome represented higher accuracy and reliability than linear regression analysis. Also, the identification of influential parameters represents a crucial impact on the future investigations.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science (MS)
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Civil Engineering (Engineering and Technology)
- Grantor dc:publisher
- Ohio University
- Year dc:date
- 2010
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Attal, Asadullah
- Advisor dc:contributor.advisor
-
- Tatari, Mehmet
Subjects
dc:subject × 6Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1282146503