Abstract
dc:descriptionFirst, we study the problem of rescheduling for multiple new orders. Assume that a set of original jobs has been scheduled on a single machine, but not processed, when a set of new jobs arrives. The decision maker needs to insert the new jobs into the existing schedule without excessively changing it. The objective is minimization of the maximum lateness of the jobs, subject to a customer service requirement modeled by a limit on the maximum time change of the original jobs. We show that this scheduling problem is intractable, even if no new jobs arrive. We describe several approximation algorithms and analyze their worst-case performance. Next, we develop a branch and bound algorithm that solves 99.9% of randomly generated instances with up to 1000 jobs within 60 seconds. Second, we consider a multiple product supply chain where a manufacturer receives orders from several distributors. If the orders cannot all be met from available production capacity, then the manufacturer allocates that capacity among the distributors. The distributors may share their allocated capacity among themselves before submitting revised orders. Finally, the manufacturer schedules the revised orders to minimize its cost. We consider three practical coordination issues. First, we estimate the benefit to the manufacturer from considering scheduling costs and constraints in making capacity allocation decisions. Second, we estimate the additional profit that the distributors achieve when they share their allocated capacity. Third, we estimate the value of coordination between the manufacturer and the distributors. Third, we consider a problem where a group of agents, each with a set of jobs, need to schedule their jobs on a common processing facility. Each agent wants to minimize an objective function which depends on its own job completion times. Time slots are allocated to the various jobs based on the bids of the participating agents. We investigate the efficiency and effectiveness of three ascending auction mechanisms, with market goods consisting of time slots, fixed time blocks, and flexible time blocks, respectively. We show that for the case of time blocks, there may not exist an equilibrium solution that is globally optimal.
Degree
thesis:*- Name thesis:degree_name
- Doctor of Philosophy
- Level thesis:degree_level
- doctoral
- Discipline thesis:degree_discipline
- Business Administration
- Grantor dc:publisher
- The Ohio State University
- Year dc:date
- 2007
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Liu, Zhixin
- Advisor dc:contributor.advisor
-
- Hall, Nicholas
Subjects
dc:subject × 11Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=osu1187883767