Back to search

The Ohio State University

Maximizing Gross Margin of a Pumped Storage Hydroelectric Facility Under Uncertainty in Price and Water Inflow

Abstract

dc:description

The operation of a pumped storage hydroelectric facility is subject to uncertainty. This is especially true in today’s energy markets. Published models to achieve optimal operation incorporate mechanical details of generating and pumping units, but are deterministic. The purpose of this study is to establish a model that considers uncertainty in the market price of electricity and the water inflow rate from river streams to the reservoirs. Due to the nature of the stochastic problems, a dynamic programming approach is taken. The model balances the amount of water used in the current stage and the amount of water saved for the future stages in order to maximize the total gross margin. The meta-models are constructed to evaluate the amount of water used and pumped in the current stage, and the gross margin for different schedules. The uncertainty in the market price of electricity is handled by solving for different price scenarios and estimating the meta-model error. The amount of available water for the future stages is not perfectly predictable either, as the water inflow rate to the reservoirs is subject to uncertainty. For our model, the transition in water inflow rate is simulated by a Markov process. The resulting schedule turned out to be more conservative compared to the deterministic counterpart.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Industrial and Systems Engineering
Grantor dc:publisher
The Ohio State University
Year dc:date
2009

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ikudo, Akina
Advisor dc:contributor.advisor
  • Mount-Campbell, Clark A.
Chair dc:contributor.committeechair
  • Jerald, Brevick

Subjects

dc:subject × 6

Rights

dc:rights
Statement dc:rights
  • unrestricted
  • This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
Language dc:language
English

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
OhioLINK
Base URL
etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Ikudo, Akina. Maximizing Gross Margin of a Pumped Storage Hydroelectric Facility Under Uncertainty in Price and Water Inflow. masters thesis, The Ohio State University, 2009. http://rave.ohiolink.edu/etdc/view?acc_num=osu1243970453