Back to search

The Ohio State University

An analysis of estimating accuracy of government construction contracts

Abstract

dc:description

<p>The thesis considers what criterion should be used to evaluate the accuracy of government estimates for formally advertised construction contracts. A prior analysis which utilized the absolute value of the estimating error is presented and its historical data subjected to four other types of analyses including: mathematical model building; cum sum control charts of the mean and standard deviation of the error; and cumulative distribution curves for the standard deviation of the error.</p><p>The principal conclusion was to adopt a criterion for evaluating past estimates based on the standard deviation of the distribution of the actual error.</p>

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Civil Engineering
Grantor dc:publisher
The Ohio State University
Year dc:date
1982

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Veselenak, John C.
Advisor dc:contributor.advisor
  • Larew, Richard E.

Rights

dc:rights
Statement dc:rights
  • unrestricted
  • This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
Language dc:language
English

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
OhioLINK
Base URL
etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
related terms
citation

Veselenak, John C.. An analysis of estimating accuracy of government construction contracts. masters thesis, The Ohio State University, 1982. http://rave.ohiolink.edu/etdc/view?acc_num=osu1261314427