Single stage bi-criteria master production scheduling with sequence dependent changeovers in process industries
Abstract
dc:description<p>This dissertation examines heuristic scheduling methods that improve master production scheduling (MPS) performance for single stage bi-criteria make-to-stock products with sequence dependent changeovers in process industries. The two criteria are defined in terms of process changeover time and order lateness. These three scheduling heuristics represent three different approaches to heuristic design. They are: (1) global interchange (30PT); (2) Construction heuristic; and (3) random search (Simulated Annealing).</p><p>Simulation experiments along with a 4-Way ANOVA design are reported that test the performance of the 3OPT, Construction, and Simulated Annealing heuristics in reducing process changeover time and order lateness. These heuristics are tested against three performance measurements: (1) percent improvement in process changeover time against the MPS; (2) percent improvement in order lateness against the MPS; (3) percent over optimal solution. Operating conditions frequently encountered in process industries provide the operating environment. Two decision variables: (1) scheduling heuristics; and (2) tradeoff parameter and two operating variables: (1) problem size; and (2) coefficient of variation of changeover matrix make up the 4-way ANOVA design.</p><p>The results indicate that the operating conditions have a significant effect on performance of the three scheduling heuristics, and there is a significant interaction among the scheduling heuristics and the operating conditions. The results indicate that the construction heuristic provides major improvement in process changeover time against the MPS for large problems in comparison with 3-OPT and SA. Simulated Annealing and 3-OPT provide major improvement in both process changeover time and order lateness under a high coefficient of variation setting. 3-OPT and SA perform well against the optimal solution across all operating environments in comparison with the construction heuristic.</p>
Degree
thesis:*- Name thesis:degree_name
- Doctor of Philosophy
- Level thesis:degree_level
- doctoral
- Discipline thesis:degree_discipline
- Business Administration
- Grantor dc:publisher
- The Ohio State University
- Year dc:date
- 1999
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Hill, James Alton, Jr.
- Advisor dc:contributor.advisor
-
- Berry, William L.
Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=osu1269529481