Abstract
dc:descriptionAccurate and rapid cost estimation forms the essential part of any organization in this highly competitive era. A cost system is comprised of multiple factors and an efficient cost estimation system needs to capture all these factors. Especially in the case of die-casting the cost estimation involves a large number of factors for estimating each of the cost heads like processing cost, material cost and tooling cost. It has been identified in this research that estimating tooling cost creates a bottleneck in rapid response to request for quotations. Tooling cost also becomes significant where parts are produced in small quantities.The research work presented here has been carried out to address the problem of die-casters and the US Department of Defense. The die casters are not able to identify profitability of individual order they process due to the use of traditional costing methods. The Department of Defense wants to know the reason and solution to the problem of high response time to the request for quotations (RFQ’s).This research work identifies the cause of high response time and underlying reasons for this problem. The cost model presented in this thesis uses the state of art accounting practice of activity based costing to capture the “true cost” of the tooling job order. This helps toolmakers realize the true cost of the job order. Also the cost model helps semi-skilled personnel of the company to estimate the cost as the entire set of activities involved in die tool manufacturing are analyzed while implementing the cost model. Every job order will be a subset of these activities. The research work demonstrates the implementation of this cost model with the use of case studies.This cost model is high on accuracy scale as it captures the cost more effectively in contrast to the past work in this area using regression [Mehalawi, 1999] & [Bidanda, Kadidal, Billo Int. J Prod 1998 vol 36 No 2] or group technology techniques [Dharamaraj Veeramani, 1995 Elsevier science]. The only place compromised is the one time big effort required to set up this cost-estimation system in the organization. Once in place, the benefits accrued will be immense.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Industrial and Systems Engineering
- Grantor dc:publisher
- The Ohio State University
- Year dc:date
- 2001
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Sawhney, Ashish
- Advisor dc:contributor.advisor
-
- Brevick, Jerald
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=osu1407507868