Back to search

University of Cincinnati

OPTIMAL PREVENTIVE MAINTENANCE SCHEDULING IN SEMICONDUCTOR FABS

Abstract

dc:description

Preventive maintenance is a valuable tool in minimizing unexpected tool downtime in semiconductor fabs. This thesis is spawned from the research project, "Preventive Maintenance1 in Semiconductor Fabs", sponsored by the Semiconductor Research Corporation (SRC) and International SEMATECH. The project is a joint venture between the University of Cincinnati and University of Maryland that looks to improve the planning and scheduling of preventive maintenance (PM) on tools in semiconductor fabs. The project proposes a two-level hierarchical optimization structure that considers important factors such as the work-in-progress (WIP) at a tool and the complex relationships between the chambers of a cluster tool. This thesis focuses on the lower level of the aforementioned hierarchy that deals with PM scheduling. It expands on the work accomplished thus far in the project, specifically analyzing and fixing current issues with the PM scheduling algorithm and creating a software implementation of the scheduling algorithm.

Degree

thesis:*
Name thesis:degree_name
MS
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Engineering : Electrical Engineering
Grantor dc:publisher
University of Cincinnati
Year dc:date
2003

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • CRABTREE, JASON PAUL
Advisor dc:contributor.advisor
  • Fernandez, Dr. Emmanuel

Subjects

dc:subject × 4

Rights

dc:rights
Statement dc:rights
  • unrestricted
  • This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
Language dc:language
English

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
OhioLINK
Base URL
etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

CRABTREE, JASON PAUL. OPTIMAL PREVENTIVE MAINTENANCE SCHEDULING IN SEMICONDUCTOR FABS. masters thesis, University of Cincinnati, 2003. http://rave.ohiolink.edu/etdc/view?acc_num=ucin1060889327