BENCHMARKING STUDY OF BRIDGE COST AND CONSTRUCTION TIME

Abstract

dc:description

State Departments of Transportation are considering the use of accelerated construction techniques as a means of reducing traffic congestion during construction. Such techniques may cost more and DOT engineers must justify the increased cost through comparison to user costs. However, in order to determine the cost increase and the time saved in construction (a component of user cost), it is necessary to know the cost and time duration of non-accelerated projects. A benchmarking study is done to determine these values for box girder bridges. This study concludes that the cost of a box girder bridge is approximately $100 +/- $40/ square foot and the construction duration is approximately 120 days +/- 40 days. However, no correlation is found between cost and any other parameter of the bridge nor is there any correlation between construction time and any other bridge parameter.

Degree

thesis:*
Name thesis:degree_name
MS
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Engineering : Civil Engineering
Grantor dc:publisher
University of Cincinnati
Year dc:date
2007

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • STONE, ANDREA
Advisor dc:contributor.advisor
  • Miller, Dr. Richard

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • unrestricted
  • This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
Language dc:language
English

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
OhioLINK
Base URL
etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

STONE, ANDREA. BENCHMARKING STUDY OF BRIDGE COST AND CONSTRUCTION TIME. masters thesis, University of Cincinnati, 2007. http://rave.ohiolink.edu/etdc/view?acc_num=ucin1186761137