University of Cincinnati
A Markov-based Analysis of the State of Ohio's Bridge Inventory and Novel Approaches to the Estimation of Bridge Degradation Rates
Abstract
dc:descriptionThe Bridge Inventory and Inspection system developed by the Ohio Department of Transportation Office of Structural Engineering provides for a collection of Bridge Data History to aid in the design, planning, programming, and financing of bridge maintenance and construction in Ohio, as well as a funding selection base by FHWA. This Data System includes a history of Operational Performance Indices (OPIs) to track bridge performance every year. The purpose is to facilitate maintenance with the objective of keeping deficiencies below specified levels for these OPI ratings. A reliable system model is warranted to predict bridge health and facilitate cost analysis and budget optimization based on forecasts made on Bridge Health. Having realized this need, a particular analytical application of significance is in using this Bridge Data History to arrive at Global and Local Degradation Rates for the bridges in Ohio. Data of relevance is collected from disparate sources, cleaned, formatted and standardized in the pre-processing stage. A suitable design is employed to implement a Data Warehouse for the entire bridge performance history. A First Markov Chain Model is the predictive model of choice. The Markov Model is built in a software network that analyses the effect of variables such as Bridge Age, climate, geographical location, material type and other factors on the health of the statistical population of bridges. The results are the Forecasts made on the OPIs and subsequently, the Degradation rates. Interpretation of these results leads to certain conclusions such as degradation rates are higher in the north as compared to the south. In this analysis, it is observed that maintenance occurs simultaneously on the bridge as it deteriorates with age. To make the Markov Model capable of indicating pure degradation that is separate from maintenance, a strategy called ‘Age Reset’ is discussed where a bridge is considered new for modeling purposes every time it undergoes a combination of maintenance actions. Also, statistical models for the frequency of maintenance are discussed that are capable of answering maintenance questions like how often a bridge is maintained and identify bridges that are outliers in this aspect. The degradation rates of bridges in Ohio and resulting interpretations guide funding and resource allocation for infrastructure investments and rehabilitation strategies.
Degree
thesis:*- Name thesis:degree_name
- MS
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Engineering : Electrical Engineering
- Grantor dc:publisher
- University of Cincinnati
- Year dc:date
- 2010
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Ramani, Sathyanarayana
- Chair dc:contributor.committeechair
-
- Helmicki, Arthur
Subjects
dc:subject × 7Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: some rights reserved. It is licensed for use under a Creative Commons license. Specific terms and permissions are available from this document's record in the OhioLINK ETD Center.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=ucin1271707686