Optimization of Formwork Management Using Building Information Modeling (BIM) and Cascading Tool
Abstract
dc:descriptionFormwork systems are accountable for a significant share of the cost of reinforced concrete structures. The application of constructability principles to the design, selection and management of formwork systems in the preconstruction phase can significantly reduce the cost of reinforced concrete construction projects. Formwork management is affected by various practical factors such as availability of forms, budget for formwork material and cost constraints, project duration, estimated installation and stripping schedule etc. Due to its dependence on human judgement, this process has not been successfully automated in the construction industry. Although many researchers have developed tools and methodologies to automate the design and selection of formwork systems, few studies have explored the benefits of improving the process of managing formwork. The focus of this research is on the development of a novel Cascading tool in MATLAB and its applicability to maximize the return on formwork investment, improve the management of formwork and optimize the re-use of formwork. The tool developed in this research uses data drawn from the Building Information Models coupled with a cascading algorithm to efficiently manage the formwork inventory on a construction project by generating a formwork re-use schedule for the project and to estimate the minimum reusable formwork material quantity required. This research presents a comprehensive review of previous research on formwork, formwork selection, design, management and BIM. It also discusses use of BIM to extract the formwork material quantity take off data and project information from the building information models and the use of this extracted information with the cascading tool developed. This study also discusses the application and capabilities of MATLAB to process huge amount of data, which are generated by building information models in this case. In addition, this study also presents a case study and a comparative analysis between the results from the proposed tool and current processes utilized by the concrete subcontractor of the case study project. The results from the quantitative and qualitative analysis of the case study supports the benefits of the cascading tool. This research concludes by discussing the potential benefits of the proposed tool, limitations and future research.
Degree
thesis:*- Name thesis:degree_name
- MS
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Engineering and Applied Science: Civil Engineering
- Grantor dc:publisher
- University of Cincinnati
- Year dc:date
- 2016
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Mansuri, Dolly N.
- Chair dc:contributor.committeechair
-
- Elzarka, Hazem
Subjects
dc:subject × 4Rights
dc:rights- Statement dc:rights
-
- unrestricted
- This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws.
- Language dc:language
- English
Identifiers
dc:identifier.*- Repository record dc:identifier
- http://rave.ohiolink.edu/etdc/view?acc_num=ucin1470743739