Oklahoma State University
Estmation Models for Production Rates of Highway Construction Activites
Abstract
dc:description.abstractThe study was conducted to develop a system to estimate a reasonably accurate production rates for controlling highway activities for the Oklahoma Department of Transportation (ODOT). The study identified critical factors and assessed their relationships with production rates of highway construction activities. It identified weather conditions, geographic location of highway projects, traffic condition, quantity of work, size of contractor; number of lanes, highway type, route type and soil type for earthwork activities as critical factors affecting production rates of highway construction activities. The study developed production rate prediction models for controlling activities with significant number of data points and prediction models based on subjective data from experts for activities with insufficient data points. In addition, Excel based program was developed based on the models.
Degree
thesis:*- Department dc:contributor.department
- School of Civil & Environmental Engineering
- College dc:contributor.school
- Engineering, Architecture, and Technology
- Grantor dc:publisher
- Oklahoma State University
- Year dc:date.issued
- 2010
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Woldesenbet, Asregedew Kassa
Rights
dc:rights.accessrights- Statement dc:rights.accessrights
-
- Open Access
- Copyright is held by the author who has granted the Oklahoma State University Library the non-exclusive right to share this material in its institutional repository. Contact Digital Library Services at lib-dls@okstate.edu or 405-744-9161 for the permission policy on the use, reproduction or distribution of this material.
- Language dc:language
- en_US
Identifiers
dc:identifier.*- Mods Identifier Filename
- Woldesenbet_okstate_0664M_10901.pdf