Back to search

Oklahoma State University

Process for reducing preliminary engineering costs for multi-sided steel poles

Abstract

dc:description.abstract

Preliminary engineering for fabrication of multi-sided steel poles encompasses two efforts: planning to allocate available human and technical resources, and engineering design to deliver the most cost effective proposal. Steel pole companies strive to manage these efforts effectively, seeking to maximize the utilization of the available resources and workforce productivity. Managers need to be able to reduce costs associated with the preliminary design because there is no financial reward unless the company receives a contract for fabrication. The results reported here will enable engineers and managers to direct the resources where they are needed most and maximize productivity and efficiency. In the current state of practice, the entire pole must be designed in order to provide an accurate estimate of pole weight which is the primary driver of pole cost. This process usually takes in excess of an hour per pole. By streamlining this preliminary design process, engineers and managers are able to focus their time on more profitable efforts.

Degree

thesis:*
Discipline thesis:degree_discipline
Civil and Environmental Engineering
Grantor
Oklahoma State University
Year dc:date.issued
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • El Gohary, Mohamed A.
Advisors dc:contributor.advisor
  • Oberlender, Garold D.
  • Lewis, Phil
Committee members dc:contributor.committeemember
  • Yang, Xiaoming
  • Ramming, Carissa H.

Rights

dc:rights.accessrights
Statement dc:rights.accessrights
  • Open Access
  • Copyright is held by the author who has granted the Oklahoma State University Library the non-exclusive right to share this material in its institutional repository. Contact Digital Library Services at lib-dls@okstate.edu or 405-744-9161 for the permission policy on the use, reproduction or distribution of this material.
Language dc:language
en_US

Identifiers

dc:identifier.*
Mods Identifier Filename
ElGohary_okstate_0664D_13379.pdf

Chain of custody

source
Harvested from
Oklahoma State University
Base URL
openresearch.okstate.edu/server/oai/request
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
related terms
citation

El Gohary, Mohamed A.. Process for reducing preliminary engineering costs for multi-sided steel poles. Oklahoma State University, 2014. https://hdl.handle.net/20.500.14446/14820