Back to search
Oklahoma State University
Analyses of Pile Load Tests Performed on H-piles Driven into Alluvial Sands
Abstract
dc:description.abstractThis report describes a comprehensive pile load testing program performed on piles driven into alluvial deposits of the Mississippi River near Alton, Illinois, at the Lock and Dam 26 (Replacement) project. This investigation was made by the United State Army Engineers Oistrict, Corps of Engineers, St. Louis, Missouri.
Degree
thesis:*- Department dc:contributor.department
- Civil Engineering
- Grantor dc:publisher
- Oklahoma State University
- Year dc:date.issued
- 1987
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Conroy, Patrick Joseph
- Advisor dc:contributor.advisor
-
- Snethen, Donald R.
- Committee members dc:contributor.committeemember
-
- Parcher, J. V.
- Dawhues, W. M.
Rights
dc:rights.accessrights- Statement dc:rights.accessrights
-
- Open Access
- Copyright is held by the author who has granted the Oklahoma State University Library the non-exclusive right to share this material in its institutional repository. Contact Digital Library Services at lib-dls@okstate.edu or 405-744-9161 for the permission policy on the use, reproduction or distribution of this material.
- Language dc:language
- en_US
Identifiers
dc:identifier.*- Mods Identifier Filename
- Thesis-1987-C754a.pdf