Universität Oldenburg
Multi-objective blackstart of an impaired ICT-reliant renewable energy system
Abstract
dc:description.abstractBy introducing advanced information and communication technologies (ICT) into distribution grids, distributed energy resources can create island grids in the distribution system. Finding the optimal composition of an island grid is a complex optimization problem that can be solved with a Multi-Agent System (MAS). While agent-based restoration algorithms are a popular concept in the literature, the interdependencies between power and ICT systems during restoration have yet to be considered. This PhD project aims to fill this gap by developing an agent-based restoration algorithm that restores power and ICT systems in parallel. The restoration process is regarded as a multi-objective optimization problem and both the restored load and ICT should be maximized. Specifically, the effect of considering ICT restoration as a separate objective is studied by comparing a version of the algorithm with ICT and without ICT.
Degree
thesis:*- Level dc:type.qualificationlevel
- phd
- Grantor dc:publisher.institution
- Universität Oldenburg
- Year dc:date.issued
- 2025
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Stark, Sanja
- Advisor dc:contributor.advisor
-
- ARRAY(0x55b969b0c628)
Subjects
dc:subject × 1Identifiers
dc:identifier.*- Repository record dc:identifier.uri
- http://oops.uni-oldenburg.de/7140/