Abstract
Researchers of Pohang Accelerator Laboratory (PAL) had a plan for inserting 20 Insertion Devices (IDs) at the drift sections of Storage ring of PAL 2 years ago. Storage ring of PAL contains 20 IDs after PLS-II upgrade. ID effects ware checked on PLS-II and Works for reducing ID effects ware performed. First, tune shift and beta beat ware checked on the planned model of arranging devices 2 years ago. Changing rate of emittance, energy spread and dynamic aperture ware checked too. And then, correction of tune on PLS-II was performed. After the correction, reductions of other ID effects ware checked. Model of arranging devices was changed just before construction of PLS-II upgrade. ID effects ware checked again and Correction of tune shift was performed again about the new model. After all, reductions of ID effects about two models ware compared.
Author and committee
dc:creator, dc:contributor.*- Author
-
- 이충희
Identifiers
dc:identifier.*- Identifier
- hdl:2014.oak/1628
- Mods Identifier Other
- OAK-2014-01126