Back to search

Pohang University of Science and Technology

Development of the mathematical model for scheduling of the polymer battery assembly process

Abstract

This paper addresses the development of the scheduling model for thepolymer battery assembly process. The problem is formulated as a mixed-integerlinear programming (MILP) model. The objective of this model is to maximize thetotal number of outputs. The amount of materials produced by every task each daycan be determined by this model. The MILP model is validated with data from thereal-world polymer battery assembly plant which can be represented as a multiproductbatch process. Through the case study, the model provides the optimaloperational scheduling of the target plant with the increase in productivityby 6.3%.

Author and committee

dc:creator, dc:contributor.*
Author
  • 이효은

Identifiers

dc:identifier.*
Identifier
hdl:2014.oak/2292
Mods Identifier Other
OAK-2014-01790

Chain of custody

source
Harvested from
Pohang University of Science and Technology
Base URL
oasis.postech.ac.kr/oai/request
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
related terms
citation

이효은. Development of the mathematical model for scheduling of the polymer battery assembly process. 2014. http://postech.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001738933