Technische Universität Dresden
Integrated sequence planning and machine scheduling for disassembly
Abstract
dc:description.abstractIn the circular economy, disassembly is a necessary prerequisite for extending the useful life of EOL products beyond their original life cycle by preparing them for the subsequent steps of remanufacturing, repair, or recycling. Successful disassembly preserves the remaining value of the inherent parts and materials, and saves cost by choosing appropriate process plans and efficiently utilizing the resources in the dismantling facility. Since the processes in disassembly are typically less standardized than in assembly, disassembly task planning often happens at an operational level, depending on the situation in the dismantling shop. Therefore, to unlock their full efficiency potential, planning the task sequences of disassembly and scheduling the corresponding operations at the workstations should go hand in hand. This thesis presents an integrated disassembly sequence planning and machine scheduling (IDPS) approach for multiple EOL products. The contribution of this work comprises novel MILP formulations for the IDPS with complete disassembly and for the multi-objective selective disassembly planning and scheduling problem, followed by their solution using exact and metaheuristic methods. It also includes a systematic methodology for generating synthetic structural data and deriving feasible disassembly process graphs on a large scale, which proves essential for testing the effectiveness and efficiency of different solution approaches. The thesis provides answers the following research questions: 1) What is the current state of research on optimization approaches to support scheduling decisions in disassembly and which directions for further research can be derived? 2) How can the integrated problem of disassembly sequence planning and machine scheduling to minimize makespan be formally described and solved? 3) How can artificial disassembly process data be generated and used to construct test instances of variable size and with different structural properties to systematically evaluate the performance of the proposed scheduling model, and can the effectiveness of the approach be verified using a real-world disassembly example from industry? 4) Does a metaheuristic approach offer an advantage over the mathematical model with regard to solving instances of different problem size and complexity? 5) What impact does the introduction of incomplete disassembly and alternative separation modes have on the optimal plan, considering CO2 savings in addition to the makespan criterion, and what is a suitable optimization approach to solve the resulting trade-off between economic and environmental considerations?
Degree
thesis:*- Level thesis:degree_level
- thesis.doctoral
- Department thesis:degree_department
- Wirtschaftswissenschaften
- Grantor dc:publisher
- Technische Universität Dresden
- Year dc:date.issued
- 2026
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Ehm, Franz
Subjects
dc:subject × 5Rights
dc:rights.accessrights- Statement dc:rights.accessrights
-
- free
- info:eu-repo/semantics/openAccess
- Language dc:language.dcterms_iso639_2
- eng
Identifiers
dc:identifier.*- Dc Publisher Identifier
- 2024114-8
- Ddb Identifier Erstkat Id
- 1981209220