Back to search

TU Bergakademie Freiberg

Modelling of input data uncertainty based on random set theory for evaluation of the financial feasibility for hydropower projects

Abstract

dc:description.abstract

The design of hydropower projects requires a comprehensive planning process in order to achieve the objective to maximise exploitation of the existing hydropower potential as well as future revenues of the plant. For this purpose and to satisfy approval requirements for a complex hydropower development, it is imperative at planning stage, that the conceptual development contemplates a wide range of influencing design factors and ensures appropriate consideration of all related aspects. Since the majority of technical and economical parameters that are required for detailed and final design cannot be precisely determined at early planning stages, crucial design parameters such as design discharge and hydraulic head have to be examined through an extensive optimisation process. One disadvantage inherent to commonly used deterministic analysis is the lack of objectivity for the selection of input parameters. Moreover, it cannot be ensured that the entire existing parameter ranges and all possible parameter combinations are covered. Probabilistic methods utilise discrete probability distributions or parameter input ranges to cover the entire range of uncertainties resulting from an information deficit during the planning phase and integrate them into the optimisation by means of an alternative calculation method. The investigated method assists with the mathematical assessment and integration of uncertainties into the rational economic appraisal of complex infrastructure projects. The assessment includes an exemplary verification to what extent the Random Set Theory can be utilised for the determination of input parameters that are relevant for the optimisation of hydropower projects and evaluates possible improvements with respect to accuracy and suitability of the calculated results.

Degree

thesis:*
Level thesis:degree_level
thesis.doctoral
Department thesis:degree_department
Fakultät für Geowissenschaften, Geotechnik und Bergbau
Grantor dc:publisher
TU Bergakademie Freiberg
Year dc:date.issued
2011

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Beisler, Matthias Werner
Advisor dc:contributor.advisor
  • Klapperich, Herbert

Subjects

dc:subject × 41

Rights

dc:rights.accessrights
Statement dc:rights.accessrights
  • free
  • info:eu-repo/semantics/openAccess
Language dc:language.dcterms_iso639_2
eng

Identifiers

dc:identifier.*
Persistent identifier dc:identifier.urn
https://nbn-resolving.org/urn:nbn:de:bsz:105-qucosa-71564

Chain of custody

source
Harvested from
QUCOSA
Base URL
www.qucosa.de/oai/
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Beisler, Matthias Werner. Modelling of input data uncertainty based on random set theory for evaluation of the financial feasibility for hydropower projects. thesis.doctoral thesis, TU Bergakademie Freiberg, 2011. https://nbn-resolving.org/urn:nbn:de:bsz:105-qucosa-71564