TU Bergakademie Freiberg
Modelling of input data uncertainty based on random set theory for evaluation of the financial feasibility for hydropower projects
Abstract
dc:description.abstractThe design of hydropower projects requires a comprehensive planning process in order to achieve the objective to maximise exploitation of the existing hydropower potential as well as future revenues of the plant. For this purpose and to satisfy approval requirements for a complex hydropower development, it is imperative at planning stage, that the conceptual development contemplates a wide range of influencing design factors and ensures appropriate consideration of all related aspects. Since the majority of technical and economical parameters that are required for detailed and final design cannot be precisely determined at early planning stages, crucial design parameters such as design discharge and hydraulic head have to be examined through an extensive optimisation process. One disadvantage inherent to commonly used deterministic analysis is the lack of objectivity for the selection of input parameters. Moreover, it cannot be ensured that the entire existing parameter ranges and all possible parameter combinations are covered. Probabilistic methods utilise discrete probability distributions or parameter input ranges to cover the entire range of uncertainties resulting from an information deficit during the planning phase and integrate them into the optimisation by means of an alternative calculation method. The investigated method assists with the mathematical assessment and integration of uncertainties into the rational economic appraisal of complex infrastructure projects. The assessment includes an exemplary verification to what extent the Random Set Theory can be utilised for the determination of input parameters that are relevant for the optimisation of hydropower projects and evaluates possible improvements with respect to accuracy and suitability of the calculated results.
Degree
thesis:*- Level thesis:degree_level
- thesis.doctoral
- Department thesis:degree_department
- Fakultät für Geowissenschaften, Geotechnik und Bergbau
- Grantor dc:publisher
- TU Bergakademie Freiberg
- Year dc:date.issued
- 2011
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Beisler, Matthias Werner
- Advisor dc:contributor.advisor
-
- Klapperich, Herbert
Subjects
dc:subject × 41- Wirtschaftlichkeitsuntersuchung
- Risikoanalyse
- Risikomanagement
- Random Set Theorie
- Probabilistik
- Konstruktiver Wasserbau
- Optimierung
- Simulation
- Ausbaufallhöhe
- Ausbaudurchfluss
- Kapitalwert
- Interner Zinsfuß
- Unscharfe Eingangsparameter
- Streuende Eingangsgrößen
- Bandbreiten
- Kumulierte Wahrscheinlichkeiten
- Random Set Theory
- Input Parameter Uncertainty
- Parameter Sets
- Imprecise Probabilities
- Interval Analysis
- Fuzzy Measures
- Dempster Shafer Theory
- Cumulative Probability Distribution Function
- Financial Project Feasibility
- Economic Appraisal
- Financial Modelling
- Discounted Cash Flow Method DCF
- Net Present Value NPV
- Internal Rate Of Return IRR
- Sensitivity Analysis
- Risk Assessment
- Risk Management
- Firm Energy
- Secondary Energy
- Power Purchase Agreement PPA
- Hydropower Optimisation
- Hydropower Simulation Model
- Design Discharge
- Project Development
- Investment Decision
Rights
dc:rights.accessrights- Statement dc:rights.accessrights
-
- free
- info:eu-repo/semantics/openAccess
- Language dc:language.dcterms_iso639_2
- eng
Identifiers
dc:identifier.*- Persistent identifier dc:identifier.urn
- https://nbn-resolving.org/urn:nbn:de:bsz:105-qucosa-71564