Back to search

Technische Universität Bergakademie Freiberg

Optimization of long-term quarry production planning to supply raw materials for cement plants

Abstract

dc:description.abstract

The success of a cement production project depends on the raw material supply. Longterm quarry production planning (LTQPP) is essential to maintain the supply to the cement plant. The quarry manager usually attempts to fulfil the complicated calculations, ensuring a consistent supply of raw materials to the cement plant while guaranteeing technical and operational parameters in mining. Modern quarry management relies on block models and mathematical algorithms integrated into the software to optimize the LTQPP. However, this method is potentially sensitive to geological uncertainty in resource estimation, resulting in the deviation of the supply production of raw materials. More importantly, quarry managers lack the means to deal with these requirements of LTQPP. This research develops a stochastic optimization framework based on the combination of geostatistical simulation, clustering, and optimization techniques to optimize the LTQPP. In this framework, geostatistical simulation techniques aim to model the quarry deposit while capturing the geological uncertainty in resource estimation. The clustering techniques are to aggregate blocks into selective mining cuts that reduce the optimization problem size and generate solutions in a practical timeframe. Optimization techniques were deployed to develop a new mathematical model to minimize the cost of producing the raw mix for the cement plant and mitigate the impact of geological uncertainty on the raw material supply. Matlab programming platform was chosen for implementing the clustering and optimization techniques and creating the software application. A case study of a limestone deposit in Southern Vietnam was carried out to verify the proposed framework and optimization models. Geostatistical simulation is applied to capture and transfer geological uncertainty into the optimization process. The optimization model size decreases significantly using the block clustering techniques and allowing generate solutions in a reasonable timeframe on ordinary computers. By considering mining and blending simultaneously, the optimization model minimizes the additive purchases to meet blending requirements and the amount of material sent to the waste dump. The experiments are also compared with the traditional optimization framework currently used for the deposit. The comparisons show a higher chance of ensuring a consistent supply of raw materials to the cement plant with a lower cost in the proposed framework. These results proved that the proposed framework provides a powerful tool for planners to optimize the LTQPP while securing the raw material supply in cement operations under geological uncertainty.

Degree

thesis:*
Level thesis:degree_level
thesis.doctoral
Department thesis:degree_department
Geowissenschaften, Geotechnik und Bergbau
Grantor dc:publisher
Technische Universität Bergakademie Freiberg
Year dc:date.issued
2022

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Vu, Dinh Trong
Advisor dc:contributor.advisor
  • Drebenstedt, Carsten

Subjects

dc:subject × 9

Rights

dc:rights.accessrights
Statement dc:rights.accessrights
  • free
  • info:eu-repo/semantics/openAccess
Language dc:language.dcterms_iso639_2
eng

Identifiers

dc:identifier.*
Dc Publisher Identifier
2134021-3

Chain of custody

source
Harvested from
QUCOSA
Base URL
www.qucosa.de/oai/
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Vu, Dinh Trong. Optimization of long-term quarry production planning to supply raw materials for cement plants. thesis.doctoral thesis, Technische Universität Bergakademie Freiberg, 2022. https://nbn-resolving.org/urn:nbn:de:bsz:105-qucosa2-772826