Back to search

Queen's University at Kingston

Efficient Stope Sequencing Optimization Under Grade Uncertainty Using Genetic Algorithms

Abstract

dc:description.abstract

Long-term mine planning refers to the optimization of strategies to exploit ore from a deposit efficiently and economically. It indicates which part of the orebody to extract, when to extract it, and where to send it in a way that the profitability of the operation is maximized, while complying with a set of constraints. However, the inherent grade uncertainty, stemming from limited drilling data, arises as a key challenge in mine planning. If not properly managed, this uncertainty can lead to deviations from production targets, and misleading financial expectations of the project, resulting in profit loss and a potential risk of mine shutdown. To address these challenges, stochastic mine planning leverages equiprobable realizations of the orebody to develop robust mine plans. One widely reported challenge of stochastic mine planning is the computational complexity of solving the mine scheduling problem, particularly when considering stochastic variables. Therefore, there is a need to develop efficient solution approaches for the problem to mitigate this complexity. The first part of this thesis provides an in-depth review of mine planning optimization models under grade uncertainty and their solutions methods. The review not only emphasizes the benefits of incorporating uncertainty into mine planning but also identifies the limitations and challenges encountered in existing studies. In the second part, the focus shifts to the integration of grade uncertainty into underground mine scheduling, particularly targeting strategic stope sequencing in sublevel stoping operations. The objective is to maximize the expected NPV while minimizing its variability across various equiprobable realizations of the stope layout. To efficiently solve the multi-objective optimization problem, a meta-heuristic approach based on Genetic Algorithms (GA) is developed to obtain quality solutions in a short timeframe. Moreover, the GA’s performance is enhanced to efficiently increase its searchability of the solution space. GA’s efficiency coupled with performance improvements significantly reduced the runtime, allowing for the generation and evaluation of many sequences with various parameters and risk levels for more robust and informed decision making. Finally, in the last part of this thesis, a framework is introduced to mitigate the computational complexity associated with the utilization of geostatistical simulations in stochastic mine planning applications, including risk assessment and management. The presented framework strategically decreases the number of grade realizations required for robust and informed decision making, thereby mitigating runtime issues without compromising the accurate representation of existing uncertainty.

Degree

thesis:*
Department dc:contributor.department
Mining Engineering
Grantor
Queen's University at Kingston
Year dc:date.issued
2024

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Kheirparast, Soheil
Advisors dc:contributor.supervisor
  • Sari, Yuksel Asli
  • Ortiz, Julian M.

Subjects

dc:subject × 6

Rights

dc:rights
Statement dc:rights
  • Attribution-NonCommercial 4.0 International
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/1974/33065

Chain of custody

source
Harvested from
Queens University
Base URL
qspace.library.queensu.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Kheirparast, Soheil. Efficient Stope Sequencing Optimization Under Grade Uncertainty Using Genetic Algorithms. Queen's University at Kingston, 2024. https://hdl.handle.net/1974/33065