Back to search

University of Saskatchewan

A PROBABILISTIC TECHNIQUE FOR OPERATING RESERVE ASSESSMENT USING SYSTEM OPERATING STATES

Abstract

dc:description.abstract

Operating reserve assessment in an electric power system is normally performed using deterministic criteria. Deterministic approaches do not include an assessment of the actual system reliability as they do not take into account the probabilistic or stochastic nature of system behavior and component failures. Probabilistic techniques, however, respond to the significant factors which affect the reliability of a system. Deterministic criteria are, however, easier for the system operator to understand, than a risk index determined using probabilistic techniques. In order to alleviate the difficulty in interpreting the risk index and provide more applicable information for the system operator, deterministic considerations can be included in the probabilistic assessment. A probabilistic technique is illustrated in this thesis to assess the operating reserve requirements in a system. This technique combines deterministic criteria with probabilistic indices to monitor the system wellbeing. In this approach, the generation system is classified into different system operating states. A risk index designated as the Generating System Operating State Risk (GSOSR) is defined in this thesis as the probability of residing in an undesirable operating state. The technique together with the effect on the GSOSR and the system operating state probabilities of factors such as lead time, system peak load, load forecast uncertainty and generating unit derated states are illustrated in this thesis. The inclusion of rapid start and hot reserve units and interruptible loads in the analysis can affect the GSOSR and the system operating state probabilities. The effects of these factors have been incorporated in the operating reserve assessment using the concept of area risk curves. The effect of various degrees of postponability on the GSOSR and the system operating state probabilities are also discussed. Two reliability test systems, the RBTS and the IEEE-RTS, have been utilized in the wide range of studies presented in this thesis.

Degree

thesis:*
Name thesis:degree_name
Master of Science (M.Sc.)
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Electrical Engineering
Department thesis:degree_department
Electrical and Computer Engineering
Grantor
University of Saskatchewan
Year dc:date.issued
1993

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Fotuhi_Firuzabad, Mahmud
Advisor dc:contributor.advisor
  • Billinton, R.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10388/11608

Chain of custody

source
Harvested from
University of Saskatchewan
Base URL
harvest.usask.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Fotuhi_Firuzabad, Mahmud. A PROBABILISTIC TECHNIQUE FOR OPERATING RESERVE ASSESSMENT USING SYSTEM OPERATING STATES. Masters thesis, University of Saskatchewan, 1993. https://hdl.handle.net/10388/11608