Back to search

University of Saskatchewan

Scour Protection Below Overhanging Culvert Outlets

Abstract

dc:description.abstract

Protection below overhanging culvert outlets is required to prevent scour and negate or minimize pipe undermining. Large culverts may need reinforced concrete protection, but for smaller culverts a more economical and satisfactory means of protection can be provided by using field stone. A three-dimensional model study of scour below overhanging culvert outlets was made. Testing in a plain sand bed was done first in order to outline the process by which scour occurs at an overhanging culvert outlet and the extent to which it occurs. Preliminary tests on the placement of rip-rap to reduce scour were then done to test various placement configurations. These tests were qualitative and no design procedure came about from their results. Testing in a plain rock bed was then done, and from this series of tests a design procedure for protection against scour at an overhanging culvert outlet was formulated.

Degree

thesis:*
Name thesis:degree_name
Master of Science (M.Sc.)
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Civil Engineering
Department thesis:degree_department
Civil Engineering
Grantor
University of Saskatchewan
Year dc:date.issued
1979

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Johnson, Shane R.
Advisor dc:contributor.advisor
  • Smith, C.D.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10388/15843

Chain of custody

source
Harvested from
University of Saskatchewan
Base URL
harvest.usask.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Johnson, Shane R.. Scour Protection Below Overhanging Culvert Outlets. Masters thesis, University of Saskatchewan, 1979. https://hdl.handle.net/10388/15843